GGG removed the Venetian sign that sits directly on Las Vegas Blvd. that is on top of a building with a postage stamp size footprint to off load. With the assistance of our trade partner we set scaffolding and a demo screen from the roof to the top of the sign and then systematically torched the sign and removed it in 30 picks. The heaviest pick came in at 18,000 lbs. after stripping off the EFIS wall system. Additional scope included the removal and salvage of many other components that will be reused with the new project.